Autor: |
Thomas P. Eshun, Sanjiv Sarin, M. Chandra |
Rok vydání: |
1995 |
Předmět: |
|
Zdroj: |
Computers & Industrial Engineering. 29:687-691 |
ISSN: |
0360-8352 |
DOI: |
10.1016/0360-8352(95)00156-u |
Popis: |
This paper considers the problem of determining an appropriate sequence of tasks for assembling a system from a given set of components and their interactions. The type of fix, along with information on number of parts fixed on a single base part, and number of contacts made by each part is utilized to develop an assembling sequence. The algorithm is coded in C programming language. The procedure has been applied to the assembly of a die set. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|