Construction of the MYRRHA Injector

Autor: MäDer, Dominik, Angulo, Carmen, Belmans, Jorik, Busch, Marco, Höltermann, Holger, HäHnel, Hendrik, Koser, Daniel, Kümpel, Klaus, Medeiros Romão, Luis, Podlech, Holger, Ratzinger, Ulrich, Schweizer, Waldemar, Vandeplassche, Dirk
Jazyk: angličtina
Rok vydání: 2017
Předmět:
DOI: 10.18429/jacow-ipac2017-tupva062
Popis: A collaboration of SCK•CEN, IAP and BEVATECH GmbH is currently constructing the room temperature CH section of the 16.6 MeV CW proton injector for the MYRRHA project. The elaboration of all the construction readiness files for the construction of the accelerating cavities of the first CH section (1.5 to 5.9 MeV) is ongoing. In parallel, the planning, development and fabrication of all further components of this accelerator section is in progress, while the full study for the remaining section is under preparation. This contribution is documenting the most recent status.
Proceedings of the 8th Int. Particle Accelerator Conf., IPAC2017, Copenhagen, Denmark
Databáze: OpenAIRE