Building protection for the inner city tunnel excavation for the Metro in Rome / Bauwerksschutz für den innerstädtischen Tunnelbau am Beispiel der Metro in Rom

Autor: Clemens Kummerer
Rok vydání: 2013
Předmět:
Zdroj: Geomechanics and Tunnelling. 6:464-470
ISSN: 1865-7362
DOI: 10.1002/geot.201300023
Popis: For the construction of the Metro B1 line in Rome, special settlement reduction measures were implemented for settlement-sensitive structures beside deep excavations with depths of up to 45 m. These measures were necessary due to the excavation of tunnels with 6.8 and 9.8 m diameter under challenging soil and groundwater conditions. The originally designed jet grouting bodies were replaced by compensation grouting. This enabled all works to be performed from eight shafts (maximum 24 m depth), limiting the public space requirement. The efficiency of compensation grouting was demonstrated in two full-scale field trials and the advantages of active settlement compensation were proved during tunnel excavation. Fur den Bau der Metro B1 in Rom wurden neben bis zu 45 m tiefen Baugruben auch Sondermasnahmen zur Setzungsreduktion fur verformungsempfindliche Bauwerke realisiert. Diese Masnahmen waren aufgrund des Vortriebs von Tunneln mit einem Durchmesser von 6,8 bzw. 9,8 m unter anspruchsvollen Boden- und Grundwasserverhaltnissen erforderlich. Die im Amtsentwurf geplanten DSV-Arbeiten wurden durch Kompensationsinjektionen ersetzt. Dadurch konnten die Arbeiten aus acht Schachten (max. 24 m Tiefe) ausgefuhrt werden, wodurch sich ein geringer Bedarf an offentlichen Flachen ergab. Die Effizienz der Injektionen konnte anhand von zwei grosmasstablichen Feldversuchen gezeigt und die Vorteile eines aktiven Setzungsausgleichs wahrend der eigentlichen Tunneldurchfahrt bestatigt werden.
Databáze: OpenAIRE