Maximizing hydro share in peak demand of power systems long-term operation planning
Autor: | Ivo Chaves da Silva Junior, André L. M. Marcato, Tales Pulinho Ramos, Bruno Henriques Dias, Pedro Americo Moretz-Sohn David, Rafael B. S. Brandi |
---|---|
Rok vydání: | 2016 |
Předmět: |
Operation planning
Engineering Mathematical optimization business.industry 020209 energy 020208 electrical & electronic engineering Energy Engineering and Power Technology Economic shortage 02 engineering and technology Power (physics) Term (time) Variable (computer science) Electric power system Peak demand Order (exchange) 0202 electrical engineering electronic engineering information engineering Electrical and Electronic Engineering business |
Zdroj: | Electric Power Systems Research. 141:264-271 |
ISSN: | 0378-7796 |
DOI: | 10.1016/j.epsr.2016.07.027 |
Popis: | This paper presents an improvement in the long-term hydrothermal system operation planning by including peak generation as a decision variable in the simulations, in order to better operate the hydro plants. Although this has been widely considered in the short-term, the objective is to correctly set the power system operation planning to avoid instantaneous shortages and blackouts. Thus, the instantaneous generation capacity is included in the objective function in order to better consider this variable in long-term operation planning. The results show that it is possible to significantly increase peak power by simply modifying the operation of hydro plants. Moreover, this approach does not present a significant increase in the operation costs. |
Databáze: | OpenAIRE |
Externí odkaz: |