Feasibility study of development of coal transport support infrastructure with conveyor system in coal mining industry
Autor: | Jhony, Oei Fuk Jin |
---|---|
Rok vydání: | 2020 |
Předmět: | |
Zdroj: | IOP Conference Series: Materials Science and Engineering. 1007:012142 |
ISSN: | 1757-899X 1757-8981 |
Popis: | As a result of the significant decline in coal prices in 2014 and 2015, as many as 125 coal companies closed (source: kompas.com). The survived companies are required to make a cost down in order to survive. Electric conveyor as a hauling system replaces the dump truck hauling system. The case study was conducted at one of the coal companies in Central Kalimantan where the annual target of coal hauling is 7 million tons. This investment feasibility study was carried out by economic analysis for 15 years hauling and NPV of $ -101.604,769 was obtained, IRR of -4.69%, Payback Period for 16.37 years, B / C Ratio amounting to 0.827. The investment feasibility study was also carried out for 25 years hauling (to use up the remaining coal reserves) and an NPV of $ 373,723,630, an IRR of 52.12%, a Payback Period of 0.948 years, a B / C ratio of 1.639. This investment is said to be feasible if hauling is carried out for 25 years with a target of 7 million tons per year. |
Databáze: | OpenAIRE |
Externí odkaz: |