Commissioning Status of the Linac for the Facility for Rare Isotope Beams

Autor: Haitao Ren, I. Nesterenko, D. Omitto, P. Morrison, Scott Cogan, Peter Ostroumov, F. Pellemoine, T. Larter, J. Brandon, Fabio Casagrande, D. Chabot, Yoshishige Yamazaki, Paul Gibson, Z. Li, T. Maruta, H. Maniar, Ian Grender, Kent Holland, Chris Compton, Daniel H. Morris, A. Stolz, I. Malloch, Kenji Saito, G. Kiupel, Mengxin Xu, Qiang Zhao, Steven Lidia, Ting Xu, Sang-Hoon Kim, S. Rodriguez, B. Barnes, Martin Konrad, T. Yashimoto, H. Ao, Evan Daykin, Laura Popielarski, G. Bollen, C. Morton, R. Bennett, Guillaume Machicoane, P. Manwiller, Rebecca Shane, Kelly Davidson, D. Georgiobani, E. Bernal-Ruiz, P. Rodriguez, Thomas Russo, Alexander Plastun, Leslie Hodges, E. Pozdeyev, Masanori Ikegami, John Popielarski, J. Wei, Nathan Bultman, G. Timko, M. Hausmann, Walter Hartung, Aftab Hussain, Shen Zhao, B. Martins, S. Stanley, B. Bull
Rok vydání: 2020
Předmět:
Zdroj: Journal of the Korean Physical Society. 77:344-350
ISSN: 1976-8524
0374-4884
Popis: The Facility for Rare Isotope Beams will be completed in late 2021. We report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and thenbeam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.
Databáze: OpenAIRE