Autor: |
Andrea Silingardi, Stefano Cecchi, Enrico Puppo, Pio Astrua |
Rok vydání: |
2015 |
Předmět: |
|
Zdroj: |
Volume 3: Coal, Biomass and Alternative Fuels; Cycle Innovations; Electric Power; Industrial and Cogeneration. |
Popis: |
This paper presents a method to assess compressor mass flow, pressure line and stability, including blow-off lines behavior, during a heavy duty gas turbine (GT) start up. A Company proprietary compressor mean line analysis 1-dimensional code (C1D) has been calibrated on 3D RANS calculations and matched with a 1D Fanno model to simulate the compressor behavior during GT start-up; discharge compressor pressure and secondary air system boundary conditions are provided by filed test data. C1D is based on correlations tuned with available CFD and experimental data; within the present work the code has been validated with experimental data at low mechanical speed too, so that it can be used in such applications where conventional CFD analyses are most likely to fail. In this paper C1D is used to analyze the compressor start-up characteristic from idle to full speed no load operation. Pressure rise along the compressor and blow-off line mass flow are compared and validated throughout a field test campaign. Finally the method developed is applied to an evolutionary compressor in order to analyze how the stage-wise load distribution varies with mechanical speed and blow-off mass flow.Copyright © 2015 by ASME |
Databáze: |
OpenAIRE |
Externí odkaz: |
|