Popis: |
The purpose of this document is to provide the overall planning framework for the role of simulation in the integration/optimization of treatment process trains for the High Level Waste (HLW) Program at Idaho National Engineering and Environmental Laboratory (INELL). This project involves a TTP (Technical Task Plan ID77WT31, Subtask C) with Savannah River Site (SRS) to jointly develop a simulation tool set that can support flowsheet optimization for HLW treatment trains at INEEL. Despite the commonality between the simulation efforts at SRS and INEEL, the individual work scopes of the two sites are different – that of the INEEL is broader. This document concerns only the scope of the INEEL effort, and it describes the boundaries of several scope-related planning areas for this project INEEL: 1) the objective of the project – the needs (drivers) the simulation efforts are attempting to satisfy, the role simulation results will play in managerial decision making, and the type of issues to be investigated; 2) constraints – higher-level budget forecasts and schedules, legal commitments, customer directives, and other similar forces that a priori define boundary elements; 3) the process domain – the set of chemical and physical operations to be modeled; 4) the model’s life cycle – the phases of the waste treatment’s life cycle that will utilize simulation, i.e., process configuration, design, and/or operations; 5) the types of models involved in the integrated simulation tool set – discrete vs. continuous, deterministic vs. stochastic, etc.; and 6) and targeted users – the downstream activities that may potentially use the simulation results. This document closes with a description of the budget, schedule, and task inter-relationships that result from the determined scope. This document is the cornerstone of the planning process, and many of the software requirements flow directly from the decisions discussed in this document. |