design of the electrical part of a pulverized coal power plant with a capacity of 4Ã500 MW
Jazyk: | ruština |
---|---|
Rok vydání: | 2022 |
Předmět: |
ÑаÑÑÐµÑ Ñоков коÑоÑкого замÑканиÑ
selection of electrical equipment Ð¿Ð¾Ð´Ð±Ð¾Ñ ÑлекÑÑообоÑÑÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ calculation of short-circuit currents calculation of successful start of electric motors pulverized coal power plant ÑаÑÑÐµÑ ÑÑпеÑного запÑÑка ÑлекÑÑодвигаÑелей electric power industry ÑлекÑÑоÑнеÑгеÑика пÑлеÑголÑÐ½Ð°Ñ ÐºÑÑ |
DOI: | 10.18720/spbpu/3/2022/vr/vr22-1286 |
Popis: | Рданной ÑабоÑе пÑоекÑиÑÑеÑÑÑ Ð³Ð»Ð°Ð²Ð½Ð°Ñ ÑÑ ÐµÐ¼Ð° ÑлекÑÑиÑеÑÐºÐ¸Ñ Ñоединений пÑлеÑголÑной ÐÐС моÑноÑÑÑÑ 4Ñ 500 ÐÐÑ. ÐÑи  вÑполнении  ÑабоÑÑ  бÑл  пÑоизведен   вÑбоÑ  оÑновного ÑлекÑÑообоÑÑÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ð¸ опÑималÑной ÑÑÑÑкÑÑÑной ÑÑ ÐµÐ¼Ñ ÑÑанÑии. ÐпÑÐµÐ´ÐµÐ»ÐµÐ½Ñ Ñоки коÑоÑкого замÑканиÑ. РаÑÑÐµÑ Ñоков коÑоÑкого замÑканиÑ. Ðо полÑÑеннÑм ÑезÑлÑÑаÑам бÑли вÑбÑÐ°Ð½Ñ Ð¾ÑновнÑе коммÑÑаÑионнÑе аппаÑаÑÑ, а именно вÑклÑÑаÑели и ÑазÑединиÑели, ÑÐ¸Ð½Ñ Ð¸ ÑоковедÑÑие ÑаÑÑи, измеÑиÑелÑнÑе ÑÑанÑÑоÑмаÑоÑÑ Ñока и напÑÑжениÑ. ÐÑла ÑазÑабоÑана главное ÑÑ ÐµÐ¼Ð° ÑлекÑÑиÑеÑÐºÐ¸Ñ Ñоединений ÑÑанÑии. ÐÑделÑно бÑла ÑаÑÑмоÑÑена ÑиÑÑема ÑобÑÑвеннÑÑ Ð½Ñжд ÑлекÑÑоÑÑанÑии. ÐÑли вÑбÑÐ°Ð½Ñ ÑабоÑие и ÑезеÑвнÑе ÑÑанÑÑоÑмаÑоÑÑ ÑобÑÑвеннÑÑ Ð½Ñжд, ÑаÑÑÑиÑÐ°Ð½Ñ Ñоки коÑоÑкого замÑканиÑ, ÑепловÑе импÑлÑÑÑ. Ðо ÑезÑлÑÑаÑам ÑаÑÑеÑа бÑли вÑбÑÐ°Ð½Ñ Ð²ÑклÑÑаÑели и кабели на ÑекÑиÑÑ ÑобÑÑвеннÑÑ Ð½Ñжд ÑÑанÑии. ÐÑедÑÑÐ°Ð²Ð»ÐµÐ½Ñ ÑеÑÑежи: ÑпÑоÑÐµÐ½Ð½Ð°Ñ ÑÑ ÐµÐ¼Ð° ÑÐµÑ Ð½Ð¾Ð»Ð¾Ð³Ð¸ÑеÑкого Ñикла пÑоизводÑÑва ÑлекÑÑоÑнеÑгии, компоновка зданий и обоÑÑÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ð½Ð° ÑеÑÑиÑоÑии ÑлекÑÑоÑÑанÑии, Ð³Ð»Ð°Ð²Ð½Ð°Ñ ÑÑ ÐµÐ¼Ð° ÑлекÑÑиÑеÑÐºÐ¸Ñ Ñоединений, ÑÑ ÐµÐ¼Ð° ÑобÑÑвеннÑÑ Ð½Ñжд, план ÐРУ, ÑазÑез по ÑÑейке одного из ÐРУ. In this work, the main scheme of electrical connections of a pulverized coal power plant with a capacity of 4x500 MW is being developed. When performing the work, the main electrical equipment and the optimal structural diagram of the station were selected. Short-circuit currents have been determined. Calculation of short-circuit currents. Based on the results obtained, the main switching devices were selected, namely switches and disconnectors, buses and live parts, measuring current and voltage transformers. The main electrical connection diagram of the station was developed. Separately, the system of auxiliary needs of the power plant was considered. Working and standby transformers for auxiliaries were selected, short-circuit currents and heat impulses were calculated. Based on the results of the calculation, switches and cables were selected for the station auxiliaries sections. The drawings are presented: a simplified diagram of the technological cycle of electricity production, the layout of buildings and equipment on the territory of the power plant, main wiring diagram, auxiliaries diagram, outdoor switchgear plan, section along the cell of one of the outdoor switchgear. |
Databáze: | OpenAIRE |
Externí odkaz: |