Real-Time Hybrid Coiled Tubing Services Improved Confidence and Reliability for Delivering a Successful Zonal Isolation Intervention

Autor: Salvatore Luppina, Alessandro Mangione, Pasquale Imbò, Salvatore Spagnolo, Pasquale Cappuccio, Pasquale Pollio, Gianluca Fortunato, Yoanne Santin, Manuel Ridenti, Riccardo Caldarelli
Rok vydání: 2022
Zdroj: Day 2 Tue, February 22, 2022.
Popis: The well (Figure 1) of the case study presented in this paper is an oil producer from carbonate reservoir located in Southern Europe. Reservoir is characterized by a complex fracture network that increases the difficulties of production optimization actions, as for example water shut off interventions. This well is completed with a 4-1/2" liner extending to a 4-1/2" slotted liner inside a 6" open hole (OH). During the production time, the Water Cut (WC) has increased steadily finally reaching 94%, preventing the well from producing naturally. Log acquisition and interpretation, with Production Logging Tool (PLT) and Spectral Noise Logging (SNL), have shown that the water was coming from a fractures network laying behind the liner, to enter the top of the slotted liner despite swellable packers A and B. The lack of accessibility to this fractures network was therefore posing a challenge for an effective placement of a sealant gel.
Databáze: OpenAIRE