Autor: |
John Hoffner, Jack Whittier, David Krick, Scott Stibrich, Richard Campbell, Beth Dart, Kurt Lyell, Jaya Jackson |
Rok vydání: |
2013 |
Předmět: |
|
Zdroj: |
2013 IEEE 39th Photovoltaic Specialists Conference (PVSC). |
Popis: |
With the dramatic reductions in PV installed costs in the last decade, CH2M HILL's staff observes that emphasis is misplaced on cost per installed watt rather than on long-term reliability and plant operations. Installing least cost equipment or ignoring the reliability metrics of equipment can result in higher operating costs and higher costs per delivered megawatt hour. CH2M HILL presents some highlight issues observed during our PV project consulting experience. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|