Control of turnaround maintenance project to control time performance of the project
Autor: | Nendra Gunawan, Leni Sagita Riantini, Rossy Armyn Machfudianto |
---|---|
Rok vydání: | 2023 |
Zdroj: | INTERNATIONAL CONFERENCE ON BIOMEDICAL ENGINEERING (ICoBE 2021). |
ISSN: | 0094-243X |
DOI: | 10.1063/5.0133137 |
Databáze: | OpenAIRE |
Externí odkaz: |