Control of turnaround maintenance project to control time performance of the project

Autor: Nendra Gunawan, Leni Sagita Riantini, Rossy Armyn Machfudianto
Rok vydání: 2023
Zdroj: INTERNATIONAL CONFERENCE ON BIOMEDICAL ENGINEERING (ICoBE 2021).
ISSN: 0094-243X
DOI: 10.1063/5.0133137
Databáze: OpenAIRE