Co-scheduling model and algorithm of the three Gorges-Gezhou dam based on GA

Autor: Huan Qi, Henghui Xiao, Xiaoping Wang, Xiaopan Zhang
Rok vydání: 2008
Předmět:
Zdroj: 2008 7th World Congress on Intelligent Control and Automation.
DOI: 10.1109/wcica.2008.4593521
Popis: This paper provided a mathematic model for Three Gorges-Gezhou dam co-scheduling problems, based on full analysis of Three Gorges-Gezhou dampsilas actual needs, to maximize the total throughput of Three Gorges-Gezhou dam, to maximize the utilization ratio of shiplock area and minimize the total navigation shiplock waiting time under eight constraint conditions. Then a scheduling algorithm based on GA was pointed out. The Three Gorges south lock, Gezhou dam lock, the Three Gorges north lock were optimization searched separately in the GA algorithm. The scheduling results of the Three Gorges south lock were taken as the origin of the whole plan period, and also were taken as the basis of the Gezhou dam scheduling together with the ship applied information. The scheduling results of Gezhou dam were regarded as the basis of the Three Gorges north lock scheduling together with the ship applied information, so repeated, until the optimal scheduling results were given, or the most iterative step was reached. The applied result shows that making a period plan of two dam five lock only needs 2 minutes, and the plan is quite effective according to practical application.
Databáze: OpenAIRE