Development of a project for the reconstruction of a section of the highway in the Komi Republic
Jazyk: | ruština |
---|---|
Rok vydání: | 2021 |
Předmět: |
ÑÑиÑение
ÑеÑайклинг widening project of work production ÑеконÑÑÑÑкÑÐ¸Ñ Ð°Ð²ÑомобилÑнÑÑ Ð´Ð¾Ñог calendar schedule road reconstruction recycling пÑÐ¾ÐµÐºÑ Ð¿ÑоизводÑÑва ÑÐ°Ð±Ð¾Ñ road авÑомобилÑÐ½Ð°Ñ Ð´Ð¾Ñога календаÑнÑй гÑаÑик |
DOI: | 10.18720/spbpu/3/2021/vr/vr21-1858 |
Popis: | Рданной ÑабоÑе пÑоизводилаÑÑ ÑеконÑÑÑÑкÑÐ¸Ñ ÑÑаÑÑка авÑомобилÑной доÑоги III каÑегоÑии пÑоÑÑженноÑÑÑÑ 7000 м пÑÑем ÑÑиÑениÑ, а Ñакже ÑкÑÐµÐ¿Ð»ÐµÐ½Ð¸Ñ ÑÑÑеÑÑвÑÑÑей доÑожной одеждÑ. Ð Ñ Ð¾Ð´Ðµ вÑÐ¿Ð¾Ð»Ð½ÐµÐ½Ð¸Ñ ÑабоÑÑ Ð±Ñли ÑеÑÐµÐ½Ñ ÑледÑÑÑие задаÑи: 1. ÐзÑÑение пÑиÑодно-климаÑиÑеÑÐºÐ¸Ñ Ð¸ ÑкономиÑеÑÐºÐ¸Ñ ÑÑловий Ñайона ÑеконÑÑÑÑкÑии; 2. ÐÑÐ±Ð¾Ñ Ð¿Ð¾ÑÑавÑиков и баз маÑеÑиалÑно-ÑÐµÑ Ð½Ð¸ÑеÑкого обеÑпеÑениÑ; 3. РаÑÑмоÑÑÐµÐ½Ñ ÑÐµÑ Ð½Ð¸ÑеÑкие Ñ Ð°ÑакÑеÑиÑÑики ÑеконÑÑÑÑиÑÑемого ÑÑаÑÑка; 4. ÐÑедÑÑавлена ÑÐµÑ Ð½Ð¾Ð»Ð¾Ð³Ð¸ÑеÑÐºÐ°Ñ Ð¿Ð¾ÑледоваÑелÑноÑÑÑ Ð¿ÑÐ¾Ð²ÐµÐ´ÐµÐ½Ð¸Ñ Ð½ÐµÐ¾Ð±Ñ Ð¾Ð´Ð¸Ð¼ÑÑ Ð¿ÑоÑеÑÑов, ÑазÑабоÑÐ°Ð½Ñ ÑÐµÑ Ð½Ð¾Ð»Ð¾Ð³Ð¸ÑеÑкие ÑÑ ÐµÐ¼Ñ; 5. РазÑабоÑана ÑмеÑÐ½Ð°Ñ Ð´Ð¾ÐºÑменÑаÑÐ¸Ñ Ð½Ð° ÑкÑепление и ÑÑиÑение доÑожной одеждÑ; 6. ÐпÑÐµÐ´ÐµÐ»ÐµÐ½Ñ Ð¼ÐµÑопÑиÑÑÐ¸Ñ Ð¿Ð¾ конÑÑÐ¾Ð»Ñ ÐºÐ°ÑеÑÑва вÑполнÑемÑÑ ÑабоÑ; 7. ÐÑÐ¸Ð²ÐµÐ´ÐµÐ½Ñ Ð¾ÑновнÑе меÑопÑиÑÑÐ¸Ñ Ð¿Ð¾ Ð¾Ñ Ñане ÑÑÑда, безопаÑноÑÑи ÑÑÑоиÑелÑÑÑва и по Ð¾Ñ Ñане окÑÑжаÑÑей ÑÑÐµÐ´Ñ Ð² пеÑиод ÑеконÑÑÑÑкÑии; 8. СоÑÑавлен линейнÑй календаÑнÑй гÑаÑик ÑеконÑÑÑÑкÑии ÑÑаÑÑка авÑомобилÑной доÑоги. Ð ÑезÑлÑÑаÑе вÑÐ¿Ð¾Ð»Ð½ÐµÐ½Ð¸Ñ ÑабоÑÑ Ð±Ñла опÑеделена обÑÐ°Ñ Ð¿ÑодолжиÑелÑноÑÑÑ ÑеконÑÑÑÑкÑии ÑаÑÑмаÑÑиваемого ÑÑаÑÑка авÑомобилÑной доÑоги. ÐÑедÑÑÐ°Ð²Ð»ÐµÐ½Ñ ÑÐµÑ Ð½Ð¾Ð»Ð¾Ð³Ð¸ÑеÑкие ÑÑ ÐµÐ¼Ñ Ð¿ÑоизводимÑÑ ÑабоÑ, ÑÑанÑпоÑÑÐ½Ð°Ñ ÑÑ ÐµÐ¼Ð° доÑÑавки маÑеÑиалÑно-ÑÐµÑ Ð½Ð¸ÑеÑÐºÐ¸Ñ ÑеÑÑÑÑов, ÑазÑабоÑан линейнÑй календаÑнÑй гÑаÑик ÑабоÑ, а Ñакже ÑоÑÑавлена ÑмеÑÐ½Ð°Ñ Ð´Ð¾ÐºÑменÑаÑÐ¸Ñ Ð½Ð° доÑожнÑÑ Ð¾Ð´ÐµÐ¶Ð´Ñ In this work, the reconstruction of a section of the category III highway with a length of 7000 m was carried out by widening and strengthening the existing road surface. In the course of the work, the following tasks were solved: 1. Study of the natural, climatic and economic conditions of the reconstruction area; 2. Selection of suppliers and logistics bases; 3. The technical characteristics of the reconstructed site are considered; 4. The technological sequence of the necessary processes is presented, technological schemes are developed; 5. The estimated documentation for strengthening and widening of the road surface has been developed; 6. Measures for quality control of the performed works are defined; 7. The main measures for labor protection, construction safety and environmental protection during the reconstruction period are given; 8. A calendar schedule for the reconstruction of the road section has been drawn up. As a result of the work, the total duration of the reconstruction of the considered section of the highway was determined. The technological schemes of the performed works, the transport scheme of delivery of material and technical resources are presented, the linear calendar schedule of works is developed, and the estimated documentation is made. |
Databáze: | OpenAIRE |
Externí odkaz: |