Schedule Compression of Construction Project: A Review

Autor: Vikas Shinde, Manish Bharadwaj, M. K. Trivedi
Rok vydání: 2020
Předmět:
Zdroj: Intelligent Computing Applications for Sustainable Real-World Systems ISBN: 9783030447571
DOI: 10.1007/978-3-030-44758-8_26
Popis: Construction projects are complex nature wise which having different types of task and risk. This requires the need of proper schedule planning and team work which complete the project within the specified time duration. Much time project management had to reduce the project duration because of many factors that raise the demand of compressing schedule. The construction management provides the various methods to project practitioner so that they can accomplish their task by reducing the estimated duration. The various methods including crashing, Time Cost Trade-Off, substitution of activity, resource reallocation, and overlapping are the best strategy which reduces the project duration in efficient way. The research represented in this paper aims to represent factors causing compression of schedule and overview the techniques to compress the schedule and comparing them under different criteria.
Databáze: OpenAIRE