Status Report of the Berlin Energy Recovery Linac Project BERLinPro

Autor: Abo-Bakr, Michael, Anders, Wolfgang, Bergmann, Yvonne, Bürkmann-Gehrlein, Klaus, Bundels, Anne, Büchel, Alexander, Echevarria, Pablo, Frahm, Andre, Glock, Hans-Walter, Glöckner, Felix, Göbel, Frank, Hall, Benjamin, Heling, Svenja, Hoberg, Hans-Georg, Jankowiak, Andreas, Kalus, Christian, Kamps, Thorsten, Klemz, Guido, Knobloch, Jens, Kolbe, Jörg, Kourkafas, Georgios, Kühn, Julius, Kuske, Bettina, Kuszynski, Jens, Matveenko, Alexander, McAteer, Meghan, Meseck, Atoosa, Müller, Roland, Neumann, Axel, Ohm, Nina, Ott, Klaus, Panofski, Eva, Pflocksch, Fabian, Pichl, Lutz, Rahn, Joachim, Schmeißer, Martin, Schüler, Oliver, Schuster, Michael, Ullrich, Jan, Ushakov, Andriy, Völker, Jens
Jazyk: angličtina
Rok vydání: 2018
Předmět:
DOI: 10.18429/jacow-ipac2018-thpmf034
Popis: The Helmholtz-Zentrum Berlin is constructing the Energy Recovery Linac Prototype BERLinPro, a demonstration facility for the science and technology of ERLs for future light source applications. BERLinPro is designed to accelerate a high current (100 mA, 50 MeV), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. We report on the last year's progress, including the comissioning of the gun module as the first SRF component to be installed in BERLinPro.
Proceedings of the 9th Int. Particle Accelerator Conf., IPAC2018, Vancouver, BC, Canada
Databáze: OpenAIRE