Hardware Upgrades Improve the Reliability at BESSY II

Autor: Schälicke, Andreas, Anders, Wolfgang, Borninkhof, Jorg, Dürr, Volker, Goslawski, Paul, Hellwig, Axel, Heugel, Andreas, Hoberg, Hans-Georg, Hoffmann, Harry, Jankowiak, Andreas, Kolbe, Jörg, Kuske, Peter, Mielczarek, Grzegorz, Müller, Roland, Pflückhahn, Dirk, Ries, Markus, Rotterdam, Stefan, Ruprecht, Martin, Schriefer, Bernhard, Simmering, Dietmar, Stein, Hannes
Jazyk: angličtina
Rok vydání: 2016
Předmět:
DOI: 10.18429/jacow-ipac2016-wepow012
Popis: The synchrotron light source BESSY II is now in its second decade of operation. Already in 2013 both top-up and fast orbit feedback have been introduced into user operation. Currently, the facility is undergoing significant hardware upgrades in order to fulfill the increasing demands of its user community in terms of reliability, stability and flexibility. These include replacement of the DORIS cavities with EU HOM damped cavities, the upgrade of the RF transmitters to solid state amplifiers, implementation of the shifted waist optics for the new in-vacuum undulator, and refurbishment of the superconducting multi-pole wiggler. In this contribution status of BESSY II operation and the upgrade projects is reported.
Proceedings of the 7th Int. Particle Accelerator Conf., IPAC2016, Busan, Korea
Databáze: OpenAIRE