Autor: |
K.D. Isakov, N.A. Glushchenko, A.S. Osipenko, E.A. Sherstoboev, V.V. Lyapin, D.A. Ragozina, A.A. Spirin |
Rok vydání: |
2020 |
Předmět: |
|
Zdroj: |
Geomodel 2020. |
DOI: |
10.3997/2214-4609.202050012 |
Popis: |
Summary The scope of multilayer field development tasks includes not only issues of production economic efficiency, but also a complex approach to the program of additional appraisal of development targets. Adequate development of additional appraisal strategy during production drilling allows to effectively lower uncertainties and risks in full development of fields with complex structure. The report describes the main features of the downthrown block development targets of the Vostochno-Messoyakhskoye field, as well as the main factors that influenced step-by-step drilling strategy development and effective additional appraisal. Thanks to advance drilling for the lower productive horizon, it was possible to clear up a number of key ambiguities on transit formations, refine the strategy of operating wells drilling and bring additional development targets into production. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|