Autor: |
Philippe Laborie, J. Christopher Beck, Thierry Vidal, Julien Bidot |
Rok vydání: |
2006 |
Předmět: |
|
Zdroj: |
IFAC Proceedings Volumes. 39:615-620 |
ISSN: |
1474-6670 |
DOI: |
10.3182/20060517-3-fr-2903.00313 |
Popis: |
The problem we tackle is progressive scheduling with temporal and resource uncertainty. Operation durations are imprecise and alternative resources may break down. Operation end times and resource breakdowns are observed during execution. In this paper, we assume we have a representation of uncertainty in the form of probability distributions which are used in the simulation of schedule execution. We generate the schedule piece by piece during execution and use simulation to monitor the execution of the partial schedule. This paper describes the basis on which the decision to select and schedule a new subset of operations is made. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|