Popis: |
Under the assumptions of plane strain, vertical normal stress and shear stress distribution in surrounding rock of rectangular tunnels before and after installing anchor cable are studied. And according to the mechanics of materials, the formula of stress distribution in the roof is corrected. According to the corrected formula of the stress distribution, the dangerous points are found. And the dangerous point location does not change before and after installing anchor cable. It still locates in the middle and ends of roadway roof. Just the dangerous stress value decreases after installing anchor cable. There are the maximum tensile stress in the midpoint roof and the maximum shear stress on both ends of the roof. |