Commissioning Status of Linear IFMIF Prototype Accelerator (LIPAc)

Autor: Kasugai, Atsushi, Abbon, Philippe, Akagi, Tomoya, Antoniazzi, Loris, Bazin, Nicolas, Beauvais, Pierre-Yves, Bellan, Luca, Bolzon, Benoit, Bortolato, Damiano, Cara, Philippe, Chauvin, Nicolas, Chel, Stéphane, Comunian, Michele, Dzitko, Hervé, Ebisawa, Takashi, Fagotti, Enrico, Gex, Dominique, Gobin, Raphael, Grespan, Francesco, Heidinger, Roland, Hirata, Yosuke, Ichimiya, Ryo, Jiménez-Rey, David, Jokinen, Antti, Kirpitchev, Igor, Knaster, Juan, Kondo, Keitaro, Maebara, Sunao, Marqueta, Alvaro, Marroncle, Jacques, Mollá, Joaquin, Montis, Maurizio, Moya, Ivan, Méndez, Purificación, Palmieri, Antonio, Phillips, Guy, Pisent, Andrea, Podadera, Ivan, Pruneri, Giuseppe, Regidor, David, Renard, Bertrand, Sakamoto, Keishi, Scantamburlo, Francesco, Shinya, Takahiro, Sugimoto, Masayoshi, Weber, Moisés, de la Morena, Cristina
Přispěvatelé: Institut de Recherches sur les lois Fondamentales de l'Univers (IRFU), Commissariat à l'énergie atomique et aux énergies alternatives (CEA)-Université Paris-Saclay
Jazyk: angličtina
Rok vydání: 2018
Předmět:
Zdroj: 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams
61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams, Jun 2018, Daejeon, South Korea. pp.THP1WB01, ⟨10.18429/JACoW-HB2018-THP1WB01⟩
Popis: International audience; The IFMIF project aiming at material tests for a future fusion DEMO reactor is under the EVEDA phase in the BA Agreement of fusion program between Japan and EU. As the accelerator activity, the installation and commissioning of the Linear IFMIF Prototype Accelerator (LIPAc) is at the second stage of demonstration of the feasibility of the low energy section of an IFMIF deuteron accelerator up to 9 MeV with a beam current of 125 mA, CW. The installation of injector, RFQ, MEBT, D-Plate and LPBD for LIPAc with 8 coaxial high-power transmission lines and RF power system was just done in 2017 at Rokkasho, Japan. After that, the RF conditioning of RFQ for beam commissioning is underway. The beam commissioning of RFQ with H⁺/D⁺ and the acceleration demonstration up to 5 MeV-125 mA-0.1% duty cycle with D⁺ will be done.