Operations & Maintenance Simulation for Tidal Energy Converters

Autor: Hu, B., Stock-Williams, C.F.W.
Jazyk: angličtina
Rok vydání: 2018
Předmět:
Popis: he Netherlands is establishing its own test and development centre for marine energy: the Dutch Marine Energy Centre (DMEC), in order to facilitate essential real sea experience. However, realistic simulations in software is also important: helping avoid expensive failures, plan costs and choose vessels and equipment for offshore renewable energy farms. ECN O&M Calculator is a time domain simulation tool used to model different Operations & Maintenance (O&M) strategies for offshore wind farms and to compute the corresponding KPIs. This has been converted to be useful for tidal current energy farms, through the following adaptations: 1. An updated user interface; 2. Use of tidal currents and weather at multiple locations for operability assessment of vessels; 3. More flexible and multiple shift patterns to use short, changing access periods at slack tide; 4. Separation between deterministic tidal currents and uncertain waves for simulation, and use of tidal currents-instead of wind-for turbine performance; 5. Inclusion of a powerful weather simulator to improve understanding of long-term variability of KPIs. This new tool is applied to case studies through working closely with Tocardo International BV, a developer of tidal current energy turbines based at Den Oever, The Netherlands. The expected performance of their planned test projects, at FORCE in Canada and EMEC in Scotland, are assessed in terms of costs and availability, based on the planned O&M strategy. Subsequently, improved O&M strategies for these projects are explored through simulations. At FORCE, waiting on spares and waiting for vessels to complete long transits have a significant impact on farm performance. The 15-year average availability using the baseline O&M strategy is 69.2%, costing 5.08 M$/year. By applying a stock control to two spare parts, the availability increases to 90.7% (yield) while the costs increase to 5.88 M$/year. Further, the planned number of three standby speedboats is unnecessary, and can be reduced to one. At EMEC, a similar result is found, where stock control and improving the speed of the tug boats can significantly improve performance. The baseline O&M strategy results in average availability of 68.7%, costing 0.25M£/year. By contrast, the best strategy found gives an availability of 84.4%, costing 0.32M£/year.
Databáze: OpenAIRE