IMPROVEMENT OF QUALITY CONTROL SYSTEM IN CROATIA

Autor: Lemajić, Slavko, Rožić, Nevio, Rapaić, Mladen
Jazyk: angličtina
Rok vydání: 2003
Předmět:
Popis: Croatian Geodetic Institute (CGI) was founded in February 2001 and started with professional work at December of 2001. CGI is an independent institution but working closely with State Geodetic Administration (SGA). According to Law on State Survey and Real Estate Cadastre (Croatian Parliament, 1999) CGI is responsible for scientific geodetic and surveying works and for quality control of geodetic products produced by geodetic companies. At the beginning of professional work CGI started with performing of digital orthophoto control and analogue topographic maps control. At that time the CGI quality system was not in accordance with ISO standards. The Book of Ordinance (State Geodetic Administration, 2001) was the key document for ensuring quality control. Lack of software systems and hardware infrastructure, supporting data necessary for quality control, procedures and formal QC documentation were the main reason to start establishment and development of new CGI Quality System for quality control of geodetic products. Croatian-Norwegian Geoinformation Project (CRONO GIP) started in June 2002. Implementation of component c) of the Norwegian assisted Project in Croatia for enhancing the capabilities of the Croatian Government to build a National Spatial Data Infrastructure has according to Terms of reference (Statens Kartverk, 2001) three objectives: CGI shall be able to control the quality of topographic data produced by geodetic companies for SGA, CGI shall be able to perform satisfactory controlling of the quality of topographic maps and orthophotos produced by geodetic companies and CGI shall be able to prepare draft regulations and standards in line with international standards, to be applied by geodetic companies for assuring and documenting quality in the production of geographic data. Before Implementation of CRONO GIP results, CGI performed the Test Quality Control. The Dataset, which was the subject of Control, CGI have controlled according to Specification which are made for Data Upgrade. The Results with Reports of Test Control are delivered to Producers for corrections. After Corrections the Structure of Dataset was acceptable for further methods of control.
Databáze: OpenAIRE