Autor: |
Dannettel, R. C., Harris, G. S. |
Zdroj: |
Journal of Fluids Engineering; July 1950, Vol. 72 Issue: 5 p557-558, 2p |
Abstrakt: |
In the summer of 1948, the Consolidated Gas Electric Light and Power Company of Baltimore ordered a 75,000kw-capability, 3600-rpm, straight-condensing unit for installation as No. 4 Unit in its Riverside Generating Station. This selection was made after consideration of units both for straight-condensing and reheat cycles and was based upon judgment that the nonreheat unit should be more economical in total dollar costs to the company during the life of the unit. |
Databáze: |
Supplemental Index |
Externí odkaz: |
|