Autor: |
Rogers, R., Austin, L., Brame, K. |
Zdroj: |
Minerals & Metallurgical Processing; November 1986, Vol. 3 Issue: 4 p240-246, 7p |
Abstrakt: |
The breakage parameters of phosphate ore were determined by batch first-ordering grinding studies in a laboratory ball mill according to the Austin, Klimpel, and Luckie procedures. The results were scaled to five larger mills of 0.56, 0.82, 3.36, 4.41, and 5 m in diameter assuming equilibrium ball charges for the full-scale mills. The results were used to predict product size distributions and capacities for batch grinding in the smaller mills and open-circuit grinding in the larger mills. The predicted capacities were in approximate agreement with experimental values except for the 5-m diam mill. The Bond method gave capacity predictions that were 45% to 150% too high. |
Databáze: |
Supplemental Index |
Externí odkaz: |
|