Autor: |
GRIGG, W L, WEST, G M, HEIJNE, I S, HOOK, B J, KEMBLE, J R, MARDEN, B D, WAKELING, H L, BRAY, C W, HAMILTON, W A H, SEDGWICK, P, GURNER, D, BROWNE, C T, NRA, BROWNE, S A |
Zdroj: |
Proceedings of the Institution of Civil Engineers: Water Maritime and Energy; December 1994, Vol. 106 Issue: 4 p385-391, 7p |
Abstrakt: |
DISCUSSION Chesil Sea Defence Scheme: concept, design and construction, and design of interceptor drain B. J. Hook, J. R. Kemble, I. S. Heijne and G. M. West W. L. Grigg, NRA -Wessex Region As an employee of the National Rivers Authority, my main concern has been with the maintenance and performance since construction was completed. 2. The storm of 16 December 1989 produced substantial percolation through the section of the ridge which is unprotected by the works, and a total of 11 washout points (`CAANS') occurred... |
Databáze: |
Supplemental Index |
Externí odkaz: |
|