Autor: |
Yuetian Liu, Zupeng Ding, Kun Ao, Yong Zhang, Jun Wei |
Předmět: |
|
Zdroj: |
SPE Journal; Dec2013, Vol. 18 Issue 6, p1081-1091, 11p |
Abstrakt: |
The article proposes a manufacturing method for a fractured porous media for experimental of an oil reservoir that aims to reduce the uncertainty of reservoir numerical simulation. It highlights the bonding of large numbers of small-cube rocks with the natural rocks of selected outcrops with the same size to form a big rock. It indicates that the big rock is the manufactured porous model for experimental reservoir simulation. |
Databáze: |
Supplemental Index |
Externí odkaz: |
|