Quasi-variational inequality approach to multi-item single machine lot scheduling problem.

Autor: Thoma, M., Wyner, W., Davisson, L. D., MacFarlane, A. G. J., Kwakernaak, H., Massey, J. L., Tsypkin, Ya Z., Viterbi, A. J., Kall, Peter, González, Roberto L. V., Muramatsu, Kenji, Rofman, Edmundo
Zdroj: System Modelling & Optimization; 1992, p885-893, 9p
Abstrakt: We study in this paper the optimization of a production system comprising a multi-item single machine. Taking into account the switching-costs, we analyze the optimization of the system in terms of a system of Quasi-Variational-Inequalities (QVI). We study the structure of this QVI system, its solution and numerical methods to solve it. [ABSTRACT FROM AUTHOR]
Databáze: Supplemental Index