Autor: |
Cetiner, Sacit M., Muhlheim, Michael D., Flanagan, George F., Wood, Richard T. |
Předmět: |
|
Zdroj: |
Nuclear News; Feb2015, Vol. 58 Issue 2, p48-52, 5p |
Abstrakt: |
The article discusses the potential of a Level-0 probabilistic risk assessment (PRA) to increase plant safety and availability when integrated into the design and operation of a nuclear power plant control system. Topics include the capabilities developed by Oak Ridge National Laboratory to incorporate probabilistic assessments into a reactor control system on a real-time basis, and the integration of the Level-0 PRA and validating thermal-hydraulic calculations into simplified control system. |
Databáze: |
Supplemental Index |
Externí odkaz: |
|