Using powerful mining-transport equipment for building the second stage of the Novoraisk Mine.

Autor: Berezhnoi, I., Garmash, N., Furta, A., Starykh, M., Klimenko, N.
Zdroj: Refractories; 1971, Vol. 12 Issue 7/8, p436-438, 3p
Abstrakt: Powerful mining-transport equipment designed for operating the second phase of the Novoraisk Mine should be used for carrying out the mining-capital work, and this will reduce the time required for bringing the second section of the mine on stream. Preliminary preparation of the tracks for the cut-out channels (removing the black earth and the potentially useful bed) will afford the possibility in the initial period of building and resolving the problems of mining-engineering stages of recultivation. The proposed combined scheme for cutting out the channels will facilitate drying out of the section during the building of the quarry. [ABSTRACT FROM AUTHOR]
Databáze: Complementary Index