Experience gained from automation of starting operations in a 200-MW two-boiler single-turbine power unit equipped with once-through coal-fired boilers.

Autor: Baranov, V., Ginzburg, L., Gorskii, E., Romanchuk, I., Rul'kovskii, V., Rul'kovskii, A.
Zdroj: Thermal Engineering; Oct2011, Vol. 58 Issue 10, p829-839, 11p
Abstrakt: Results obtained from a large set of investigations, search for, and perfection of the technology for starting 200-MW two-boiler single-turbine power units from different thermal states are presented. An algorithm for automated starting of the boiler shell from its hot state is given as an example. [ABSTRACT FROM AUTHOR]
Databáze: Complementary Index