Autor: |
Ferland, R., Piraszewski, M. |
Předmět: |
|
Zdroj: |
Journal of Geodesy; Mar2009, Vol. 83 Issue 3, p385-392, 8p |
Abstrakt: |
The International GNSS Service (IGS) routinely generates a number of weekly, daily and sub-daily products. Station coordinates and velocities, earth rotation parameters (ERPs) and apparent geocenter are among these products generated weekly by the IGS Reference Frame Coordinator. They have been determined since 1999 by combining independent estimates from at least seven IGS Analysis Centers (ACs). Two Global Network Associate Analysis Centers (GNAACs) also provide independent combinations using the same AC weekly solutions and they are currently used to quality control the IGS combination. The combined solutions are aligned to an IGS realization (IGS05) of the ITRF2005 using a carefully selected set of the IGS Reference Frame (RF) stations (nominally 132). During the combination process, the contributing solutions are compared and outliers are removed to ensure a high level of consistency of the estimated parameters. The ACs and the weekly combined solution are consistent at the 1–2 and 3–4 mm levels for the horizontal and vertical components. Similarly, the excess Length of Day (LOD), the pole positions and pole rates are consistent at the 10μs, 0.03–0.05 mas and 0.10–0.20 mas/day levels, respectively. The consistency of the apparent geocenter estimate is about 5 mm in the X and Y components and 10 mm in the Z component. Comparison of the IGS-combined ERP estimates with the IERS Bulletin A suggests a small bias of the order of −0.04 mas and + 0.05 mas (both ±0.05 mas) in the x and y components. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|