Autor: |
Rugmai, S., Hoyes, G. G., Prawanta, S., Kwankasem, A., Siriwattanapitoon, S., Suradet, N., Pimol, P., Junthong, N., Boonsuya, S., Janpuang, P., Prawatsri, P., Rujirawat, S., Klysubun, P. |
Předmět: |
|
Zdroj: |
AIP Conference Proceedings; 2007, Vol. 879 Issue 1, p58-61, 4p, 1 Diagram, 2 Graphs |
Abstrakt: |
The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented. © 2007 American Institute of Physics [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|