Autor: |
Peng-Fei Cui, De-Lei Shang, Peng Chu, Ju Li, Da-Li Sun, Tian-Yu Wang, Ming-Zhong Gao, He-Ping Xie |
Předmět: |
|
Zdroj: |
Petroleum Science (KeAi Communications Co.); Oct2024, Vol. 21 Issue 5, p3517-3534, 18p |
Abstrakt: |
Using pressure-preserved coring technique to determine in-situ gas content provides a more precise assessment of gas resource reserves and safeguard of mining safety in coal seams. How coring technique and depth affect the determination of gas content is unclear due to borehole zoning rupture caused by roadway excavation and drilling disturbance. To this end, a proposed coupling model of stress distribution and gas migration was simulated and validated by FLAC3D and COMSOL Multiphysics considering superposition effects of roadway excavation and drilling disturbance. The findings indicate that the roadway surrounding rock displays distinct zoning features including stress relief zone, stress concentration zone that is composed of plastic zone, elastic zone, and original stress zone; and the broken situations depending on the borehole peeping are consistent with the corresponding simulation results. On this basis, this study proposes a set of drilling coring depth calculation and prediction model for the gas desorption affected area under engineering disturbance. Optimal depth of coring drilling is not only approach to the in-situ coal bulk, but also can get the balance of the drilling workload and cost controlling. According to the typical mine site geological conditions and the numerical simulation results in this study, if the roadway excavation time is ~1 year, it is recommended that the pressure-preserved coring depth should be greater than 17 m. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|