Research on "Playing Football" Type Roof Control in Fully-Mechanized Mining Face with a Super-Large Mining Height under the Background of 5G+ Big Data.

Autor: Liu, Jianyu, Xiao, Fukun, Shan, Lei
Předmět:
Zdroj: Applied Sciences (2076-3417); Oct2024, Vol. 14 Issue 19, p9100, 21p
Abstrakt: With the increase of mining height at the working face, the influence range of roof fractures in the goaf increases, the advanced supporting pressure on the coal wall increases, ground pressure becomes more intense, and roof support becomes more difficult. Based on the analysis of ground pressure behavior in the first mining and caving stage, the normal mining stage, and the final mining breakthrough stage of the fully-mechanized mining face near 12,404, the relationship between conveyor current and coal speed is studied and compared. Based on the intelligent control system of the fully-mechanized mining face with a super-high mining height of 12,404 and the structure of the football team, the "playing football" roof control mode of the fully-mechanized mining face with super-high mining height under the background of 5G+ big data is put forward. The conclusions are as follows: In 12,404, the ground pressure was first mined. During normal mining, when the roof with a buried depth of more than 200 m is broken, the speed of the coal machine is kept within 12 m/min, and the full guard defends and controls the roof, pulling the lead frame through the area with severe ground pressure. When the roof is good, it is necessary to speed up the coal cutting and get rid of the pressure. When it is less than 200 m, it will overcome the local weighting, and show an offensive trend to speed up and increase production. In the final mining breakthrough stage, the speed of the coal machine should be controlled within 8 m/min, with attention to defense, guarding against roof leakage, and reducing waste rock. [ABSTRACT FROM AUTHOR]
Databáze: Complementary Index