Autor: |
Bingnan Tang, Jing Bao, Nan Pan, Mingxian Liu, Jibiao Li, Zhenhua Xu |
Předmět: |
|
Zdroj: |
International Journal of Engineering & Technology Innovation; Apr2024, Vol. 14 Issue 2, p152-164, 13p |
Abstrakt: |
Grid operation and inspection a key links to ensure the safe operation of the power system, which requires efficient task allocation and resource scheduling. To address this problem, this paper proposes a resource scheduling model for grid operation and inspection based on bi-level programming. Firstly, the O&I process is analyzed and defined as a combined optimization problem of the multiple traveling salesman problem (MTSP) and the job-shop scheduling problem (JSP). Secondly, a bi-level programming model of MTSP and JSP is established according to the characteristics of the problem. Finally, an adaptive genetic algorithm is used to solve the problem. The feasibility of the model and the advancement of the algorithm are verified through the simulation of real scenarios and a large number of tests, which provide strong support for the sustainable development of the power system. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|