Transmission & Distribution World; Jan2024, Vol. 76 Issue 1, p24-28, 5p, 5 Color Photographs |
Abstrakt: |
This article discusses the collaboration between G&W Electric, a power equipment manufacturer, and Commonwealth Edison Co. (ComEd), a local utility, to implement a microgrid project. The project aimed to provide uninterrupted power and protect against external grid failures. ComEd and G&W Electric followed six key steps, including assembling a dedicated project team, defining the project scope, conducting studies, overcommunicating, testing the equipment, and transitioning to live operation. The article highlights the challenges faced during the project and provides key takeaways for utilities venturing into similar microgrid projects. [Extracted from the article] |