Abstrakt: |
XYZ Hospital Laboratory is a medical laboratory in which the various checks carried out on biological specimens to obtain information about the state of one's health. In this study, the proposed schedule of preventive maintenance for critical components on a tool that is often damaged, a tool Mension for Cuvette component Window, R1 and R2 Probe, diaphragm, pump panel and lights. Gam tool for reagent cartridge components and tools for component Citex belt, sealer and optics. The method used to determine the optimal treatment scheduling policy is by Age Group Replacement and Replacement. Saving cost of care obtained by applying the proposed preventive maintenance on the tool Mension for R1 & R2 component of the probe and components cuvette window as big as 89.13% replacement interval of 42 days, amounting to 83.58% diaphragm component replacement intervals for 21 days, the panel Pump components of 91.45% 151 day intervals and component replacement lamp replacement interval of 74.16% 279 days. [ABSTRACT FROM AUTHOR] |