Autor: |
Tu, Siyu, Jia, Mingtao, Wang, Liguan, Feng, Shuzhao, Huang, Shuang |
Zdroj: |
Sustainability (2071-1050); May2023, Vol. 15 Issue 9, p7306, 18p |
Abstrakt: |
Equipment failure is a common problem in mining operations, resulting in significant delays and reductions in production efficiency. To address this problem, this paper proposes a dynamic scheduling model for underground metal mines under equipment failure conditions. The model aims to minimize the impact of equipment failures on production operations while avoiding extensive equipment changes. A case study of the southeastern mining area of the Chambishi Copper Mine is presented to demonstrate the effectiveness of the proposed model. The initial plan was generated using the multi-equipment task assignment model for the horizontal stripe pre-cut mining method. After equipment breakdown, the proposed model was used to reschedule the initial plan. Then, a comparative analysis was carried out. The results show that the proposed model effectively reduces the impact of equipment failures on production operations and improves overall mining execution at a low management cost. In general, the proposed model can assist schedulers in allocating equipment, coping with the disturbing effects of equipment failure, and improving mine production efficiency. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|