Modeling the operation of a 10 kW grid-tied photovoltaic power plant and its features.

Autor: Yuldoshev, Isroil, Kurbanov, Yunus, Rustamova, Shakhnoza, Yuldashev, Farrukh, Voropai, Nikolai, Stennikov, Valery, Senderov, Sergey
Předmět:
Zdroj: AIP Conference Proceedings; 2022, Vol. 2552 Issue 1, p1-7, 7p
Abstrakt: Situations for further development and construction of solar photovoltaic stations in some regions of Uzbekistan are analysed. Approaches, methods and steps of simulation of photovoltaic power plant (PVPP) without accumulating system, with a nominal capacity of 10 kW, connected to the low-voltage electric network of the Faculty of Electricity of Tashkent in the conditions of Tashkent are described. An important advantage of this plant is the presence of a monitoring system, which allows obtaining data on the operating parameters of PVPP, accumulating, systematizing and processing the results for specified periods. The results on evaluation of power generation of PVPP for hot climate conditions of Uzbekistan (from 01.12.2019 to 31.12.2020) were analyzed, the annual power generation according to the measuring data of monitoring is 14,772 MW*h, and according to the results of simulation its value is 15,315 MW*h. [ABSTRACT FROM AUTHOR]
Databáze: Complementary Index