Autor: |
SATYANARAYANA, INUMULA, NANDY, ARPAN, KUMAR, ATULYA, RAJ, ABHINAV VATS |
Předmět: |
|
Zdroj: |
Journal of Mines, Metals & Fuels; May2019, Vol. 67 Issue 5, p265-268, 4p |
Abstrakt: |
The geotechnical assessment, safe design and monitoring of highwalls is one of the major challenges in Indian open pit mines. The aim of opencast mines should be to attain steepest possible slope angle without compromising safety in order to maximize profits. Highwall stability is essential for economical and safe exploitation of mineral during open pit mining. Geotechnical investigations are required to quantify the properties of soils and rocks within the mining horizons. The required minimum safety factor for highwalls is 1.2. Highwall should be monitored during open pit operations. This paper addresses the main elements of pit slope failure, accident statistics, design, and monitoring and pit slope management and also the guidelines for safe design and monitoring of open pit highwalls in India. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|