Autor: |
Ferreira García, Karen Y., de la Riva Rodriguez, Jorge, Sánchez Leal, Jaime, Reyes-Martínez, Rosa M., Prieto, Arturo Woocay |
Předmět: |
|
Zdroj: |
Journal of Engineering (2314-4912); 3/13/2019, p1-6, 6p |
Abstrakt: |
We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%. The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue. The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|