Autor: |
Crespi, Roberto, Capparè, Paolo, Gastaldi, Giorgio, Gherlone, Enrico F. |
Předmět: |
|
Zdroj: |
International Journal of Periodontics & Restorative Dentistry; Jan/Feb2018, Vol. 38 Issue 1, p43-49, 7p, 3 Color Photographs, 1 Diagram, 2 Charts |
Abstrakt: |
The aim of this study was to evaluate buccal-lingual bone remodeling after fresh socket implant placement and immediate loading at 3 years of follow-up by cone beam computed tomography (CBCT). A total of 96 implants were placed in fresh sockets in anterior maxillary regions and immediately loaded. The sockets were divided into two groups related to buccal bone thickness: group A, with a buccal bone thickness > 1 mm, and group B, with a thickness ≤ 1 mm. The CBCT scans were performed before tooth extractions and 3 years after implant placement, and measurements were assessed. At 3 years, all fresh sockets in both groups presented considerable buccal-palatal crestal reduction. In both groups, statistically significant (P < .05) bone loss was found between time points. There was no statistically significant difference in bone reduction between groups at 3 years of follow-up. Nevertheless, sockets with vertical axis presented more bone volume reduction than those with axis parallel to buccal bone after implant placement. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|