Autor: |
Blaising, J.J., Cai, X., Chollet-Le Flour, F., Cruz, J.C., Daguin, G., Degré, A., Martin, B., Masserot, A., Perrot, G., Zhu, M. |
Předmět: |
|
Zdroj: |
IEEE Transactions on Nuclear Science; Aug98 Part 1 of 3, Vol. 45 Issue 4, p1765, 6p, 1 Diagram, 10 Graphs |
Abstrakt: |
Presents information pertaining to the L3 experiment which is considered to be one of the four experiments collecting data at LEP phase II, the second trigger being upgraded to a network of 28 ST T9000 transputers and 2 ST C104 asynchronous packet switches interconnected by IEEE1355 links. Collection of trigger data; Consistency of the second level event building; Exploitation of transputer based networks. |
Databáze: |
Complementary Index |
Externí odkaz: |
|