ConGRASPulations, a success story: The revival of workload to ensure tomorrow's success.

Autor: Michaelson S; Patient Care Manager, C6 Surgical Oncology., Long A; Advanced Practice Nurse, Surgical Oncology., Avila E; Educator, Surgical Oncology.
Jazyk: angličtina
Zdroj: Canadian oncology nursing journal = Revue canadienne de nursing oncologique [Can Oncol Nurs J] 2017 Oct 01; Vol. 27 (4), pp. 386-387. Date of Electronic Publication: 2017 Oct 01 (Print Publication: 2017).
Abstrakt: In our organization, nursing staff are required to complete a work load measurement tool (GRASP) every shift. This information is used to determine nurse/patient ratios and perform cost analysis. On a Surgical Oncology and Medical Short-Stay Unit, the nursing staff had not completed the GRASP over several years. Data did not reflect the actual work load of nurses on the unit. With a new Patient Care Manager, there was an emphasis on improving performance with GRASP. Strategies were implemented to increase utilization. At the end of the one-month period, there was a significant improvement in completion rates from 55.22% to 95.64%. As a team, we celebrated the successes with a "conGRASPulations" luncheon. Over the last five months, the process has been sustained with a 95.37% compliance rate.
Databáze: MEDLINE