Construction of the new Forbach pumped storage plant.
Autor: | Stech, Hans‐Joachim1 (AUTHOR) hjs@hic-engineering.de, Achatz, Robert2 (AUTHOR) robert.achatz@tractebel.engie.com, Strasser, Peter3 (AUTHOR) Peter.Strasser@geoconsult.com, Thermann, Karsten4 (AUTHOR) karsten.thermann@tractebel.engie.com, Caccavo, Gabriella3 (AUTHOR) Gabriella.Caccavo@geoconsult.com, Gommel, Ulrich5 (AUTHOR) u.gommel@enbw.com, Kamuf, Ingo5 (AUTHOR) i.kamuf@enbw.com |
---|---|
Zdroj: | Geomechanik und Tunnelbau. Oct2022, Vol. 15 Issue 5, p469-477. 9p. |
Databáze: | Academic Search Ultimate |
Externí odkaz: |