A stochastic mine planning approach to determine the optimal open pit to underground mining transition depth – case study at the Geita gold mine, Tanzania.

Autor: MacNeil, J.1 (AUTHOR), Dimitrakopoulos, R.1 (AUTHOR) roussos.dimitrakopoulos@mcgill.ca, Peattie, R.2 (AUTHOR)
Zdroj: Mining Technology (2572-6668). Sep2022, Vol. 131 Issue 3, p181-190. 10p.
Databáze: Academic Search Ultimate
Nepřihlášeným uživatelům se plný text nezobrazuje