Real-Time Scheduling of Mixed Model Assembly Line with Large Variety and Low Volume Based on Event-Triggered Simulated Annealing (ETSA).

Autor: Cai, Chunzhi1 (AUTHOR), Kan, Shulin1 (AUTHOR)
Zdroj: Mathematical Problems in Engineering. 5/7/2021, p1-8. 8p.
Databáze: Academic Search Ultimate