A Stochastic Programming Approach for Resilient Hub Location in Power Projection Network considering Random Hub Failures.

Autor: Zhang, Xu-Tao1, Bi, Hai-Ling1, Wang, Yun2
Zdroj: Mathematical Problems in Engineering. 12/21/2017, p1-8. 8p.
Databáze: Academic Search Ultimate