Popis: |
The final thesis is focused on design of valley bridging on I/38 road at the Havlickuv Brod bypass. The thesis contains study of the bridging area. For detailed assessment was chosen, from three variants, a two-beam cross-section girder of 4 spans. Load-bearing structure is designed as cast-in-place, post-tensioned, concreted at fixed falsework without phased construction. The serviceability limit state and the ultimate limit state were assessed. The thesis contains, apart from structural design, drawings and visualizations of the bridge. |